Job Description
Roles & Responsibilities
u>Strategy/u>
Traffic planning:
- Responsible for how it steers traffic in which Datacenters, also they are responsible to define new datacenters strategy.
- Following up with the Group technology on new trends like distributing traffic in many small datacenters (by getting rooms in Telecom Egypt same concept as fixed).
New Datacenters/Edge Planning
- Technology request new MTX in certain areas to acquire lands with property or Rollout (futuristic trend)
- Put requirements and specs for new space
u>Technical Room Planning/u>
- Own the Technical room infrastructure to provide power/space for technology network expansions in both mobile and fixed domains.
- Coordinate and establish technical requirements for new sites.
- Design layout of technical rooms in new sites and its interfaces with other technical rooms.
- Design paths and dimensions of cable trays within the technical rooms and their routes towards other technical rooms.
- Interfaces with property team through the establishment and preparation phases (if equipment is AC)
- Produce power capacity dashboard for power equipment.
- Participate with property in problem solving and design update to overcome construction & power problems.
- Assure availability of safety stock for racks and power equipment, covering any delayed deliveries that may cause delays in equipment implementation
- Build ahead DC Power capacity with safety buffer as per the technology business plans.
- Define overall AC and DC power requirements in new sites and optimizing needs with technology and inform Property with needed AC Power
- Establish overall cooling requirements in new sites and optimize needs.
u>MTX Optimization& Modernization & Automation/u>
- Introduce innovative solutions that can help reduce VF-Egypt's energy consumption and contribute to the migration green environment.
- Putting high standards for Installations to ensure efficient use of space and cooling.
- Develop utilization reports for different electromechanical equipment in mobile and fixed locations.
- Analysis and optimization of different electromechanical infrastructure equipment.
- Automate the power capacity reports to be able to monitor, optimize and report the overall and detailed capacity aspects in VFE technology centers.
- Managing the life cycle of Technology Equipment by removing old ones and propose modernization of old equipment to get more efficient power.
- Modernize DC Power stations
u>Electromechanical Equipment roadmap management:/u>
- Plan and dimension the electromechanical equipment for fixed locations and MEC according to VF group strategy.
- Handle the supplier releases and roadmaps for fixed and MECs.
- Identify the different milestones for each product family.
u>Stakeholder Management/u>
- Handle technical conflicts with vendor.
- Prepare progress reports for senior management.
- Handle all technology teams requirements for network expansions.
u>Budget Planning/u>
- Manage required FY budget withing team goals & requirements.
- Prepare and issue FY BCs and get BC approval up to CAB meetings.
- Manage the technology centers budget assigned to property team to facilitate technology centers requirements.
u>Materials Capacity Planning/u>
- Manage stores materials releasing movements and delivery tools for any MTX to meet all requested installations.
- Manage Inventory to ensure resources are available for planned requirements.
- Issue monthly reports to monitor the current materials situation.