- Implementing technical office policies and procedures.
- Study the project contract documents (time schedule, project design drawings, BOQ, etc.).
- Update the shop drawing log before sending the shop drawing to the consultant for approvals.
- Study and prepare requests for information (Rf Is) for all missing, unclear, conflicting or other technical matters that may arise during construction.
- Review sub-contractors’ shop drawings as well as outsourced shop drawings and coordinate their approval process with the project consultant.
- Coordinate with Surveying Engineer to provide him all the information about land coordinates and any site measurement required.
- Participate in solving/reporting any unexpected technical difficulties, and other problems that may arise during construction for discussion and proper solve.
- Prepare as-built drawings at the end of the project and hand over to the project consultant.
- Coordinate between the architectural and electro-mechanical sections
- Creating job orders to be sent to production to manufacture marbel.
Microsoft OfficeStrong project management and negotiation skills.Good command of the English Language.Problem solverAuto Cad