Full Time
--
Arabian Trade &equipment -Ateco

Job Details

  • HVAC systems design, redesign, design review, preparing, up loading and following up
    (shop drawings, material approval submitals, method of statement, quantity surveying, RFI,
    RFP, RFQ, VO, B.O.Q, price break down, systems coordination with other related
    disciplines, Invoices, supplying orders and inspection requests). 
  •  HVAC systems; chilled water, DX systems (High wall split, split concealed
    ducted and non-ducted, cassette, rack, VRV and VRF), Garages ventilation
    systems, Ducted and non-ducted stairs pressurizing fans, Garbage chute
    systems, mechanical rooms special systems, freezing rooms, Hoods, KED and
    Electrical rooms systems. 
  •  Plumbing systems design, redesign, design review, preparing, up loading and following up
    (shop drawings, material approval submittals, method of statement, quantity surveying, RFI, 
    RFP, RFQ, VO, B.O.Q, price break down, systems coordination with other related
    disciplines, Invoices, supplying orders and inspection requests). 
  •  Plumbing systems; internal drainage and water supply systems suspended and
    buried, external drainage and water supply networks, inspection chambers,
    main valves chambers, house connections, gully traps, central water heating
    stations, slow down chambers, intelligence water valves chambers and
    connecting it with BMS.  
  •  Fire Fighting systems design , redesign, design review, preparing, up loading and following
    up (shop drawings, material approval submittals, method of statement, quantity surveying,
    RFI, RFP, RFQ, VO, B.O.Q, price break down, systems coordination with other related
    disciplines, Invoices, supplying orders and inspection requests). 
  •  Fire Fighting systems; Wet Sprinkler network up right and pendent, Standpipe
    system, double and single FHC, CO2, FM-200, F.F Pumps Rooms, Fire
    Extinguishers and Main F.F valves chambers and its house connection.   
  •  Irrigation systems design, redesign, design review, preparing, up loading and following up
    (shop drawings, material approval submittals, method of statement, quantity surveying, RFI,
    RFP, RFQ, VO, B.O.Q, price break down, systems coordination with other related 
    disciplines, Invoices, supplying orders and inspection requests). 
  •  Irrigation systems; Main irrigation valves chambers, irrigation tank, irrigation
    pumps room, irrigation house connections, Drip irrigation valves box and its
    paths and Drips, irrigation sprinklers valves box and its paths and sprinklers, air
    release valves and filters, control panels and connectinInfra Structure systems design, redesign, design review, preparing, up loading and
    following up (shop drawings, material approval submittals, method of statement, quantity
    surveying, RFI, RFP, RFQ, VO, B.O.Q, price break down, systems coordination with other
    related disciplines, Invoices, supplying orders and inspection requests). 
  •  Infra Structure systems; sewage, storm, firefighting, water supply, irrigation
    networks, manholes, main valves chambers, maintenance chambers, air release
    valves chambers, subsurface drainage network, fire hydrants and lifting stations
    intelligence valves chambers and connecting it with BMS

Similar Jobs