رسام Autocad 2D

HVAC Design Engineering & Quantity survey : 

DX, VRF, Chilled water systems; 

Equipments : FCU, Package unit, AHU, TFA, wall mounted, Floor mounted, Exhaust fans etc.

To study architectural drawings, reflected ceiling plan & site images provided by the Site Engineer.

Analyse and Calculate heat load of the project through HAP software & E20 sheet.

Suitable Equipment selection based on estimated heat load.

Air distribution system (Duct & grills) design and drafting in AutoCad / Autocad MEP.

Quantity surveying for all HVAC Works.

B.O.Q preparation as per design drawing.

Additional advantage if familiar with :

Plumbing design & quantity survey as per KSA standards.

Firefighting design & quantity survey as per KSA standards.

Electrical design & quantity survey as per KSA standards.

Softwares : REVIT, Navisworks, Dialux EVO

Post date: 18 September 2024
Publisher: Tanqeeb.com

Post date: 18 September 2024
Publisher: Tanqeeb.com