- Responsible for increasing the productivity of the two production lines glass wool and rock wool through drafting and implementing the required action plans as needed.
- Responsible for reducing the raw material wastes and operating the lines with the planned efficiency.
- Enhance the quality of the product by using the line parameters.
- Leading the teamwork by reallocating them to avoid the expected hot spots problems.
- Record the raw material used (input) and compare it with the output and try to reduce the rework and increase the recycle.
- Record the downtime that occurred in every shift.
- Ensure the availability of the line before each production run.
- Prepare the production lines after finishing the runs.
Degree holder in engineering course preferably mechanical, electrical, industrial.2-4 years of experience in overhauling of all rotating equipment and troubleshooting experience in process/production industries.