Site Team leader - Civil

  1. Prepare required reports regarding the work done in the site and submit it to the Construction Manager.
  2. Coordination with the technical office team in preparing the Request for Information “RFls" reports.
  3. Review workplaces and prepare reports regarding their readiness to start MEP works or not.
  4. Review the approved shop drawings from the consultant before starting MEP works.
  5. Review the contractual Bill of Quantities “BOQ" by the Project Manager.
  6. Prepare the material quantity surveying and site Material Request "MR" for it.
  7. Preparing the workplace to carry out MEP works.
  8. Preparing spaces for storing the required materials with the storekeeper.
  9. Preparing the equipment required to start the MEP works.
  10. Coordinate with his manager to provide the numbers required Man Power to start the MEP works.
  11. Participate with Construction Manager in estimating the price of the subcontractor and the casual labor price.
  12. Complete the works after the consultant’s notes (if any).
  13. Review the materials supplied to the site if they are in conformity with the approved or not with coordination with QC engineer.
  14. Prepare a matching request for the materials supplied to the site according to what has been approved and make material inspection request "MIR" for the consultant with the help of QC engineer.
  15. Follow up on the subcontractor/ casual labor in the usage of approved materials and required equipment.
  16. Coordinate with QC engineer to prepare inspection request "IR" as required after installation.
  17. Review quantity surveying for the As Built drawings.
  18. Review the warehouses regarding the materials stored in them.
  19. Monitor all MEP equipment on site along with the Construction Manager.

BSc degree in civill Engineering.Experience 8+ years in the same role in construction companies.Willing to relocate inside Egypt
تاريخ النشر: اليوم
الناشر: Wuzzuf .com
تاريخ النشر: اليوم
الناشر: Wuzzuf .com