· Checking all the submittal to be followed the Egyptian and International Cods and Standards.
· Prepare/checking shop drawings and as-built drawings.
· Issue the RFI, RFA and RFC.
· Ensure the distribution of the approved shop drawings.
· Follow up subcontractor’s progress.
· Review and issue order to pay for subcontractors’ invoices.
· Interact with the Material Engineer regarding the material submittal and specifications, resolving any unexpected technical difficulties, and other problems that may arise