Key Responsibilities
Develop, review, and maintain baseline and updated schedules.
Review contractor programmes, recovery plans, resource loading, and progress updates.
Monitor planned versus actual progress and identify deviations.
Perform critical-path, delay, float, and schedule-impact analyses.
Review look-ahead and detailed construction programmes.
Assess time-impact analyses and EOT submissions.
Prepare progress reports, dashboards, and S-curves.
Coordinate design, procurement, construction, and commissioning schedules.
Recommend corrective actions and recovery measures.
Requirements
Bachelor’s degree in Engineering.
Minimum 10 years of planning and scheduling experience.
Advanced proficiency in Primavera P6.
Experience in critical-path analysis, resource loading, and progress measurement.
Knowledge of delay analysis and EOT evaluation.
Previous consultancy, PMC, or PMO experience is highly preferred.
Strong analytical, reporting, and coordination skills.
المسؤوليات الرئيسية
تطوير ومراجعة والحفاظ على الجداول الزمنية الأساسية والمحدثة.
مراجعة برامج المقاولين، وخطط الاستدراك، وتوزيع الموارد، وتحديثات التقدم في العمل.
مراقبة التقدم الفعلي مقابل المخطط وتحديد الانحرافات.
إجراء تحليلات المسار الحرج، والتأخيرات، والهوامش الزمنية، وتأثيرات الجدول الزمني.
مراجعة البرامج الزمنية التفصيلية وبرامج العمل قصيرة المدى.
تقييم تحليلات الأثر الزمني وطلبات تمديد الوقت (EOT).
إعداد تقارير التقدم، ولوحات البيانات، ومنحنيات الإنجاز (S-curves).
التنسيق بين جداول التصميم، والمشتريات، والبناء، والتشغيل.
التوصية بالإجراءات التصحيحية وتدابير الاستدراك.
المتطلبات
درجة البكالوريوس في الهندسة.
خبرة لا تقل عن 10 سنوات في التخطيط والجدولة.
إتقان متقدم لبرنامج بريمافيرا (Primavera P6).
خبرة في تحليل المسار الحرج، وتوزيع الموارد، وقياس التقدم في العمل.
معرفة بتحليل التأخيرات وتقييم طلبات تمديد الوقت (EOT).
يفضل بشدة وجود خبرة سابقة في مجال الاستشارات أو إدارة المشاريع (PMC) أو مكاتب إدارة المشاريع (PMO).
مهارات تحليلية وتنسيقية قوية ومهارة في إعداد التقارير.